Tren del Sur














  on a railway line in Tenerife with a maximum speed of 220 km/h (140 mph) was first conducted in 1997.[1][2]

Originally, detailed planning was to begin in 2010 with the line expected to fully open in 2018.[3] However, in 2011 the plans were indefinitely postponed for economic reasons.[4] In 2017 the plan was reactivated.[5] The line is planned for an end-to-end journey time of 42 minutes, running at 15-minute intervals, carrying up to 64,000 passengers daily.

Cost[edit]

In 2010 the estimated cost of the line was €1.8 billion, with the Ministry of Developmentallocating €5 million to the Cabildo de Tenerife to plan its construction.[1]

Route[edit]

The proposed route of 80 km will contain 7 railway stations with a possible extension to Fonsalía, but starting from Santa Cruz de Tenerife to Costa Adeje, with the journey taking approximately 42 minutes.[2] Stations will be located in:[3]

Tren del Sur
Overview
StatusIn planning
Termini
Stations7
Service
Operator(s)Metropolitano de Tenerife
History
Planned openingunknown
Technical
Line length80 km
Number of tracksDouble
Track gauge1,435 mm (4 ft 8+12 in)

 